Final Design Plan Set
Agency: | State Government of Minnesota |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD14658011062152317 |
Posted Date: | Nov 22, 2022 |
Due Date: | Dec 6, 2022 |
Source: | http://www.dot.state.mn.us/con... |
Final Design Plan Set
Brief description: MnDOT requests responses for the development of a biddable final plan set and special provisions for State Project (SP) 2204-26, a full reconstruction of Minnesota Highway 22 from approximately 0.06 miles south of 12th Street SW to the north junction of Minnesota Highway 109, and a reconstruction of Minnesota Highway 109 from 0.20 miles west of Half Moon Road to Minnesota Highway 22 in Wells, MN. This project will include, but is not limited to, pavement, storm sewer, City utilities (sanitary and water to be designed by the City’s engineer and coordinated with this project), lighting, existing retaining walls, sidewalk, pedestrian curb ramps, bicycle accommodations, pedestrian and bicycle railroad crossing, access modifications, boulevard tree removal and replacement, and improvements to the south junction of Highway 22 and Highway 109 to better accommodate turning movements of trucks.
Date posted: 11/10/2022
Due date: 12/06/2022
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.