Minnesota Bids > Bid Detail

Children’s Rehab Emergency Generator Replacement

Agency: University of Minnesota
Level of Government: State & Local
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD16744368666280662
Posted Date: Nov 23, 2022
Due Date: Dec 1, 2022
Solicitation No: 01-115-22-1499

Bid Information



Type
Construction Services
Status
Issued
Number
01-115-22-1499 Addendum 2 (Children’s Rehab Emergency Generator Replacement)
Issue Date & Time
11/3/2022 01:40:42 PM (CT)
Close Date & Time
12/1/2022 02:00:00 PM (CT)
Time Left 7 days 18 hours 55 minutes 41 seconds
Notes
Construction Services for replacement of the emergency generator at the Children’s Rehab Building, located on the east bank of the Twin Cities campus . Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements.


Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMENT and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions.


Contact Information
Name
Kevin Sullivan
Address
1300 S. 2nd Street
Minneapolis, MN 55454
Phone
Fax
Email
sull0198@umn.edu





Bid Attachments













File Name Description File Size

RFP - Child Rehab.docx
Request for Proposal 315 KB

RFx Instructions and Requirements - V9.pdf
RFx Instructions, Requirements, and Rights Reserved by the University 216 KB

PWR.zip
Current Prevailing Wage Rates 478 KB

schedule-of-values-cost-sheet.xlsx
Schedule of Values Cost Sheet 222 KB

UofM_Children'sRehabCenEmergGenRepl_Project Manual - IFB 20221019 (1).pdf
Project Manual 2.25 MB

UofM_Children'sRehabCenEmergGenRepl_Plans - IFB 20221019.pdf
Drawings 5.09 MB

2197_001.pdf
Addendum # 1: Pre-Proposal Meeting Sign-in Sheet 80 KB

REVISED ATTACHMENT E.docx
Addendum # 2: Revised Attachment E 16 KB



Bid Questions
















Question
Specification 230700 indicates calcium silicate insulation on the generator exhaust with an aluminum jacket for indoor piping. Is a jacket required on outdoor piping?
Answer An aluminum jacket shall be provided on both the indoor and outdoor pipe, including the muffler.
Submitted 11/16/2022 03:46:00 PM (CT)


Question
Please provide a detail on the generator exhaust through the roof including thimble design and generator exhaust pipe materials.
Answer Detail is shown on detail 5/A600. Roof thimble is furnished with the generator. Exhaust piping shall be welded, black steel, schedule 40 and terminate at 10'-0" above the roof as noted on detail and on plans.
Submitted 11/16/2022 03:45:51 PM (CT)


Question
Is the gas flexible connection provided by the generator manufacturer?
Answer No. Contractor shall supply all fuel gas piping connections, including the flex connection per the manufacturers specific instructions.
Submitted 11/16/2022 03:45:43 PM (CT)


Question
Sheet M107 indicates “EXTEND 3” G PIPING TO SERVE NEW GENERATOR. SEE 2/M107 FOR CONNECTION DETAIL”. Detail 2/M107 indicates the use of a Maxitrol 325-3 regulator which is a low capacity regulator and would not seem appropriate for this device. Please review the selection or provide inlet/outlet and flow capacity requirements for this regulator.
Answer Specification for the generator 26 32 00 Section 2.03 includes a natural gas fuel regulator to be furnished with the engine. Pressure regulator can be omitted from detail, Contractor is responsible for all other piping connection work shown.
Submitted 11/16/2022 03:45:32 PM (CT)


Question
Please confirm that Cummins Generator is the only approved manufacture. 26 32 00 2.02
Answer Caterpillar will be added to the project specifications as another acceptable manufacturer as follows:

2.02 ACCEPTABLE MANUFACTURER'S

A. Cummins Inc., Cummins Power Generation (Formerly Onan)

B. Caterpillar Inc.

Submitted 11/16/2022 11:10:21 AM (CT)


Question
Attachment B-2 asks to list a roofing subcontractor. At the pre-bid meeting, it was noted that the roofing is still under warranty under Central Roofing. Do we need to still list a roofing contractor if this work needs to be completed by Central Roofing?

Also, Attachment B-2 asks to list a waterproofing subcontractor. Waterproofing does not appear to be included in the Scope of Work for this project. Please advise.
Answer See previous response regarding roof warranty. Waterproofing should not be required. There is no need to note the waterproofing or roofing subcontractor in Attachment B-2.
Submitted 11/16/2022 07:29:52 AM (CT)


Question
Who holds the service contract for that area for elevators for testing?
Answer The Vertical Transportation Maintenance Agreement (VTMA) is between the UMN & Schindler Elevator.
Submitted 11/14/2022 02:09:15 PM (CT)


Question
Is there any information of allowable roof load for the East side of Children's Rehab? Also any civil/underground drawings for the East side for Utilities and Tunnels?
Answer Allowable roof loads, site utilities and tunnels can be provided to the selected Respondent.
Submitted 11/14/2022 01:51:23 PM (CT)


Question
Detail 2 on sheet A600 shows the new size of the louver opening. Does the existing lintel run the full length of both openings? It also shows the new opening being approximately one (1) brick course wider than the left louver on that detail. Will a new lintel need to be provided? If so, can you provide a detail showing the size, flashing and connection details for the lintel?
Answer There is an existing cast-in place concrete structural beam (indicated on detail 1/A600) that runs the full length of the wall. A new lintel is not required, the top of the new louver should be installed to the underside of the beam, similar to the existing condition. Provide metal drip edge, flashing and sealants as shown on the detail.
Submitted 11/14/2022 06:36:59 AM (CT)


Question
Detail 5 on sheet A600 shows roofing work. Is the current roof under warranty with a roofing contractor? If so, please provide the name of the roofing company.
Answer Roofing warranty is provided through Central Roofing. UMN will share applicable details with selected Respondent.
Submitted 11/14/2022 06:36:49 AM (CT)

Items 1 - 10 shown of 16 • Page 1 of 1 shown

First 1 2 > Last



TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >