Preliminary and Final Design Plan Set
Agency: | State Government of Minnesota |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD14658148332765885 |
Posted Date: | Jun 23, 2023 |
Due Date: | Jul 17, 2023 |
Source: | http://www.dot.state.mn.us/con... |
Preliminary and Final Design Plan Set
Brief description: MnDOT requests responses for the development of a Level 1 geometric layout, stakeholder engagement technical support, a biddable final plan set and special provisions, and design support during construction for State Project (SP) 0713-81 on TH 169. This approximate 3.6-mile-long reconstruction project is addressing bridge, pavement, utility, and traffic needs on TH 169 through Mankato and North Mankato, Minnesota. A corridor study was recently completed that provided recommendations for improvements on TH 169 through Mankato and North Mankato. This project encompasses a portion of the corridor studied and will include the removal of the existing intersection at West Lind Street near the TH 14 interchange, creation of a full intersection (roundabout) at the intersection with North River Lane, and conversion of the signalized intersection at Webster Avenue to a roundabout.
Date posted: 06/22/2023
Due date: 07/17/2023
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.