CUHCC - Federal Grant Repairs and Improvements

Agency: University of Minnesota
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD16744088137712076
Posted Date: Nov 21, 2022
Due Date: Nov 29, 2022
Solicitation No: 01-171-21-1439A

Bid Information



Type
Construction Services
Status
Issued
Number
01-171-21-1439A Addendum 1 (CUHCC - Federal Grant Repairs and Improvements)
Issue Date & Time
11/1/2022 09:44:23 AM (CT)
Close Date & Time
11/29/2022 02:00:00 PM (CT)
Time Left 7 days 18 hours 49 minutes 1 seconds
Notes
Construction Services at the Community-University Health Care Center. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements.


Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMENT and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions.


Contact Information
Name
Kevin Sullivan
Address
1300 S. 2nd Street
Minneapolis, MN 55454
Phone
Fax
Email
sull0198@umn.edu





Bid Attachments














File Name Description File Size

RFP - CUHCC-1.docx
Request for Proposal 317 KB

RFx Instructions and Requirements - V9.pdf
RFx Instructions, Requirements, and Rights Reserved by the University 216 KB

PWR.zip
Current Prevailing Wage Rates 478 KB

schedule-of-values-cost-sheet.xlsx
Schedule of Values Cost Sheet 222 KB

Plans and Specs.zip
CUHCC - Federal Grant Repairs and Improvements Plans and Specifications 4.91 MB

UM 01 02 60 Unit Prices.doc
SECTION 01 02 60 – UNIT PRICES 26 KB

UM 01 03 00 Alternates.doc
SECTION 01 03 00 - ALTERNATES 30 KB

CUHCC Contract amendment Federal Busch Arch.pdf
Supplemental Federal Funding Requirements Amendment 3.56 MB

Addendum1.zip
Addendum # 1 Documents 174 KB



Bid Questions
















Question
The exterior elevations call out for the existing painted HM doors and frames to be painted. The Schedule of Unit Prices only applies to the HM Frames. Will the painting of the existing HM doors be inclusive of UNIT PRICE NO. A, or will this just fall under Alternate Bid No. 2: Exterior Painting.
Answer The exterior hollow metal door frames and doors will be painted as part of Alternate Bid No. 2 and not under Unit Prices.
Submitted 11/15/2022 09:21:56 AM (CT)


Question
The Color Schedule on sheet A4.0 indicates the LVT to be 18"x36" but within spec section 09 65 19, it states it should be 12"x24". Please verify if the LVT should be 12"x24" or 18"x36".
Answer 12" x 24".
Submitted 11/15/2022 09:21:29 AM (CT)


Question
The specification package does not include a specification section for Carpeting. Please provide a Carpet Specification to understand what manufacturer/type to use.
Answer See Addendum # 1 documents.
Submitted 11/15/2022 09:21:08 AM (CT)


Question
Darker shading on 6/A3.2 is assumed to be a Keynote #25, please confirm if this shall be included.
Answer Correct, keynote 25 should point to the shaded area.
Submitted 11/15/2022 09:20:50 AM (CT)


Question
Will the corner guards shown on the Interior Elevations that do not have a Keynote #14 be removed and replaced with new? Please advise.
Answer Yes, replace with new.
Submitted 11/15/2022 09:20:04 AM (CT)


Question
Are the door frames on the interior elevation drawings NOT containing keynote 5 painted?
Answer All door frames are painted under "Unit Prices".
Submitted 11/15/2022 09:18:26 AM (CT)


Question
Will the existing gypsum board wall and HM Frame at detail 8/A3.1 receive paint? None is called out on the plans for this detail, however this appears to be inconsistent compared to the other details. Please clarify if this wall and frame will receive paint.
Answer For the west wall of Room 004 - Room Finish Schedule 1/A4.0 indicates "Existing Gyp. Bd. Wall -Paint C1/C2". All door frames are painted under "Unit Prices".
Submitted 11/15/2022 09:13:34 AM (CT)


Question
Will the existing gypsum board walls at details 1&6/A3.1 receive paint? None is called out on the plans for this detail, however this appears to be inconsistent compared to the other details. Please clarify if this wall is to receive paint.
Answer For north wall of Room 003 and 004 - Room Finish Schedule 1/A4.0 indicates "Existing Gyp. Bd. Wall -Paint C1".
Submitted 11/15/2022 09:13:00 AM (CT)


Question
I believe the first page of spec section 01 04 50 is missing from the spec book. Do you have any information on this?
Answer See Addendum # 1 documents.
Submitted 11/14/2022 11:00:38 AM (CT)


Question
Demolition Plan Key note 18 calls to remove wallpaper border. When this is removed, we will likely have to skim this area and prep for paint. Does this border run continuous at the ceiling elevation or is it partial height up the wall?
Answer The wallpaper "border" is mid-height up the wall and is less than 6" high. It's only on walls in the Administrative area of the clinic where indicated by note 18.
Submitted 11/11/2022 12:09:27 PM (CT)