Question
|
The exterior elevations call out for the existing painted HM doors and frames to be painted. The Schedule of Unit Prices only applies to the HM Frames. Will the painting of the existing HM doors be inclusive of UNIT PRICE NO. A, or will this just fall under Alternate Bid No. 2: Exterior Painting.
|
Answer
|
The exterior hollow metal door frames and doors will be painted as part of Alternate Bid No. 2 and not under Unit Prices.
|
Submitted
|
11/15/2022 09:21:56 AM (CT)
|
|
|
Question
|
The Color Schedule on sheet A4.0 indicates the LVT to be 18"x36" but within spec section 09 65 19, it states it should be 12"x24". Please verify if the LVT should be 12"x24" or 18"x36".
|
Answer
|
12" x 24".
|
Submitted
|
11/15/2022 09:21:29 AM (CT)
|
|
|
Question
|
The specification package does not include a specification section for Carpeting. Please provide a Carpet Specification to understand what manufacturer/type to use.
|
Answer
|
See Addendum # 1 documents.
|
Submitted
|
11/15/2022 09:21:08 AM (CT)
|
|
|
Question
|
Darker shading on 6/A3.2 is assumed to be a Keynote #25, please confirm if this shall be included.
|
Answer
|
Correct, keynote 25 should point to the shaded area.
|
Submitted
|
11/15/2022 09:20:50 AM (CT)
|
|
|
Question
|
Will the corner guards shown on the Interior Elevations that do not have a Keynote #14 be removed and replaced with new? Please advise.
|
Answer
|
Yes, replace with new.
|
Submitted
|
11/15/2022 09:20:04 AM (CT)
|
|
|
Question
|
Are the door frames on the interior elevation drawings NOT containing keynote 5 painted?
|
Answer
|
All door frames are painted under "Unit Prices".
|
Submitted
|
11/15/2022 09:18:26 AM (CT)
|
|
|
Question
|
Will the existing gypsum board wall and HM Frame at detail 8/A3.1 receive paint? None is called out on the plans for this detail, however this appears to be inconsistent compared to the other details. Please clarify if this wall and frame will receive paint.
|
Answer
|
For the west wall of Room 004 - Room Finish Schedule 1/A4.0 indicates "Existing Gyp. Bd. Wall -Paint C1/C2". All door frames are painted under "Unit Prices".
|
Submitted
|
11/15/2022 09:13:34 AM (CT)
|
|
|
Question
|
Will the existing gypsum board walls at details 1&6/A3.1 receive paint? None is called out on the plans for this detail, however this appears to be inconsistent compared to the other details. Please clarify if this wall is to receive paint.
|
Answer
|
For north wall of Room 003 and 004 - Room Finish Schedule 1/A4.0 indicates "Existing Gyp. Bd. Wall -Paint C1".
|
Submitted
|
11/15/2022 09:13:00 AM (CT)
|
|
|
Question
|
I believe the first page of spec section 01 04 50 is missing from the spec book. Do you have any information on this?
|
Answer
|
See Addendum # 1 documents.
|
Submitted
|
11/14/2022 11:00:38 AM (CT)
|
|
|
Question
|
Demolition Plan Key note 18 calls to remove wallpaper border. When this is removed, we will likely have to skim this area and prep for paint. Does this border run continuous at the ceiling elevation or is it partial height up the wall?
|
Answer
|
The wallpaper "border" is mid-height up the wall and is less than 6" high. It's only on walls in the Administrative area of the clinic where indicated by note 18.
|
Submitted
|
11/11/2022 12:09:27 PM (CT)
|
|
|