Minnesota Bids > Bid Detail

Vet Med Center South CT Scan Replacement Addendum 3

Agency: University of Minnesota
Level of Government: State & Local
Category:
  • 65 - Medical, Dental, and Veterinary Equipment and Supplies
  • X - Lease or Rental of Facilities
Opps ID: NBD16744287423994252
Posted Date: Oct 31, 2022
Due Date: Nov 2, 2022
Solicitation No: 02-371-22-1759A

Bid Information



Type
Construction Services
Status
Issued
Number
02-371-22-1759A Addendum 3 (Vet Med Center South CT Scan Replacement)
Issue Date & Time
10/10/2022 08:27:22 AM (CT)
Close Date & Time
11/2/2022 02:00:00 PM (CT)
Time Left 1 days 18 hours 48 minutes 27 seconds
Notes
Construction Services for replacement of a CT scanner in Veterinary Medical Center South, located in Saint Paul of the Twin Cities campus . Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements.


Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMENT and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions.


Contact Information
Name
Kevin Sullivan
Address
1300 S. 2nd Street
Minneapolis, MN 55454
Phone
Fax
Email
sull0198@umn.edu





Bid Attachments















File Name Description File Size

RFP - Vet Med CT Scan.docx
Request for Proposal 318 KB

RFx Instructions and Requirements - V9.pdf
RFx Instructions, Requirements, and Rights Reserved by the University 216 KB

PWR.zip
Current Prevailing Wage Rates 478 KB

schedule-of-values-cost-sheet.xlsx
Schedule of Values Cost Sheet 222 KB

CDs.zip
Busch Architects 100% CD Drawing and Manual Set 6.25 MB

2202389RA (4).pdf
Siemens Preliminary Drawings and Specifications 570 KB

Drive Typical Drawing.pdf
Siemens Typical Drawings 3.12 MB

Adobe Scan Oct 18, 2022.pdf
Addendum # 1: Pre-Proposal Meeting Sign-in Sheet 285 KB

UMVetMedCTScan_Addendum2_10-21-2022 (1).pdf
Addendum # 2: RFP Clarifications 948 KB

Addendum3.pdf
Addendum # 3: RFP Clarifications-2 583 KB



Bid Questions









Question
Demo Keynote 2 says the removal of the existing CT Scan Equipment will occur prior to the start of construction by others. Will the temporary CMU opening need to be created for this removal? Or will the removal really occur prior to the start of construction and be routed through the existing man doors?
Answer The opening would be cut before removal of the existing scanner and it would be utilized. This is captured in Addendum #2.
Submitted 10/24/2022 11:40:58 AM (CT)


Question
Who is unloading and hoisting the CT Scan Outdoor Cooling Unit Exchanger unit to the roof? Will this be by Siemens? Or is this to be included by the Contractor? The documents say it is to be provided by Siemens and Installed by Contractor. Will Siemens hoist this equipment onto the Roof? Or is this hoisting to be included in the General Contractors bid?
Answer The hoisting and installation of the chiller is the responsibility of the mechanical contractor. This is similar to the MRI chiller. Siemens will deliver the chiller to wherever the mechanical contractor wants it delivered to and it will be their responsibility to get it on the roof and installed. This is also noted in the Siemens drawing started supplied by Siemens, installed by contractor. Siemens will have the chiller delivered before the CT system to ensure this is installed prior to the CT being delivered.
Submitted 10/24/2022 11:39:28 AM (CT)


Question
The substantial completion date on the RFP says February 28, 2023, however Addendum #2 that was issued had a note in there that construction is to be complete on January 22nd. Can you please confirm the substantial completion date for this project?
Answer The successful completion of the project hinges on close coordination with Siemens on the delivery, installation and start-up of the CT Scanner. The project must be substantially complete on January 22nd sufficient for an unobstructed delivery and installation of the scanner. The contractor will then complete the remaining tasks such as wall closure, final connections, etc with a final completion no later than February 28th.
Submitted 10/24/2022 11:39:16 AM (CT)







TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.