Minnesota Bids > Bid Detail

West Central Research and Outreach Center REFUEL - Ammonia Production Facility Addendum 3

Agency: University of Minnesota
Level of Government: State & Local
Category:
  • W - Lease or Rental of Equipment
Opps ID: NBD16744388015660398
Posted Date: Sep 22, 2023
Due Date: Sep 27, 2023
Solicitation No: 14-040-23-2329

Bid Information



Type
Construction Services
Status
Issued
Number
14-040-23-2329 Addendum 3 (West Central Research and Outreach Center REFUEL - Ammonia Production Facility)
Issue Date & Time
8/31/2023 12:22:24 PM (CT)
Close Date & Time
9/27/2023 02:00:00 PM (CT)
Time Left
4 days 20 hours 13 minutes 30 seconds
Notes
Design-Build Services for an Ammonia Production Facility for the West Central Research and Outreach Center . Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements.



Respondents are prohibited from contacting the identified department about this RFP while in process.


Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMEN T and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions.


Remember to submit your response, including attachments, early to allow time to correct errors. The submission deadline is a hard close. The system will reject responses with errors and will NOT allow late submissions.



Contact Information
Name
Kevin Sullivan
Address
1300 S. 2nd Street
Minneapolis, MN 55454
Phone
Fax
Email
sull0198@umn.edu





Bid Attachments





















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



21 items in 2 pages

RFP - WCROC REFUEL.docx
Request for Proposal 318 KB

RFx Instructions and Requirements - V9.pdf
RFx Instructions, Requirements, and Rights Reserved by the University 216 KB

pwr.zip
Current Prevailing Wage Rates 479 KB

Table D-1 - Project Cost and Staffing Matrix - WCROC REFUEL.xlsx
Table D-1: Project Cost Table and Staffing Matrix 26 KB

1. RTI,UMinn 2xC30 to reduce costs.pdf
Quote from NEL for the electrolyzer 450 KB

2. WCROC Site Design WIre DIagram.docx
Site Design Wire Diagram 37 KB

3. E103-Layout-2.pdf
E103_layout-2 782 KB

4. M100-site layout.pdf
M100-site layout 632 KB

5. M201 REV0 water line.pdf
M201 REV0 water line 182 KB

6. As-Builts.zip
As-Builts 20.20 MB

7. R42420_Design_Basis_Ammonia_Pilot_1MTPD(1).docx
R4240_Design_Basis_Ammonia_Pilot_1MTP 1.95 MB

8. Ammonia Absorption System Overview.pdf
Ammonia Absorption System Overview 549 KB

9. Ammonia Absorption System BFD and P&ID.pdf
Ammonia Absorption System BFD and P&ID 248 KB

10. 072910 11132 As Built Drawings.pdf
072910 11132 As Built Drawings 2.98 MB

11. Ammonia Building As Built Prints.pdf
Ammonia Building As Built Prints 3.58 MB



Bid Questions
















Question
Is the owner installing all their own equipment or is there a list of owner-supplied contractor-installed equipment?
Answer There will be a list of owner-supplied contractor-installed equipment.
Submitted 9/20/2023 11:18:55 AM (CT)


Question
Will the University have a separate design team designing the process and equipment going into the new building and the design-build design team only designs the right size building and provide the power and water in the building for your equipment to be connected to?
Answer There is a separate design team for the ammonia production system. The design-build team will be designing the new building for either the hydrogen or nitrogen system. If it is the hydrogen system in the new building, water and power will be required. If it is the nitrogen system, only power will be needed.
Submitted 9/20/2023 11:18:43 AM (CT)


Question
Will there be any work required for a new septic system or are we to only include work to tie into an existing drain pipe on the site?
Answer Unknown at this time.
Submitted 9/20/2023 10:31:04 AM (CT)


Question
We are assuming no ADA accessibility requirements are required in this build is that correct?
Answer It is anticipated there will not be an ADA requirement for this area.
Submitted 9/20/2023 10:30:53 AM (CT)


Question
We are assuming no restrooms are required in this project is this correct?
Answer No restrooms.
Submitted 9/20/2023 10:30:40 AM (CT)


Question
Are we designing to meet the code or are there portions of the building such as the efficiency of the envelope that we want to surpass the code?
Answer The project needs to design to code. Since this is a equipment shelter, there may be some exceptions to code vs. an occupied building.
Submitted 9/20/2023 10:30:31 AM (CT)


Question
Will this building need to show energy code compliance such as a com-check report?
Answer I am not sure how to answer this question at this time. These are equipment shelters, not necessarily occupied spaces.
Submitted 9/20/2023 10:30:21 AM (CT)


Question
From an architectural service perspective will the University need a signed code plan, floor, roof plans, elevations, and sections?
Answer We will need a signed code plan, floor plans, roof plans, etc.
Submitted 9/20/2023 10:30:04 AM (CT)


Question
Does the user know if the hydrogen or nitrogen production process will be in the new building and what process will stay in the existing building?
Answer This depends on the size of the hydrogen and nitrogen production systems. If either is too large to fit into the existing building, then it will be located in the new building.
Submitted 9/20/2023 10:29:52 AM (CT)


Question
Is there an anticipated size or dimensions of the new building?
Answer The new building will depend on the size of the hydrogen and nitrogen production systems. We anticipate it should be similar in size to the ammonia building.
Submitted 9/20/2023 10:29:40 AM (CT)