Minnesota Bids > Bid Detail

Gortner Lab Area Loading Dock and Concrete Hardscape Addendum 3

Agency: University of Minnesota
Level of Government: State & Local
Category:
  • 56 - Construction and Building Materials
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD16744489406534690
Posted Date: Nov 16, 2023
Due Date: Nov 20, 2023
Solicitation No: 02-410-20-1756

Bid Information



Type
Construction Services
Status
Issued
Number
02-410-20-1756 Addendum 3 (Gortner Lab Area Loading Dock and Concrete Hardscape)
Issue Date & Time
10/24/2023 09:05:16 AM (CT)
Close Date & Time
11/20/2023 02:00:00 PM (CT)
Time Left
3 days 18 hours 40 minutes 35 seconds
Notes
Construction Services for site improvements at the Gortner Lab East Loading Dock, located on the St. Paul campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements.



Respondents are prohibited from contacting the identified department about this RFP while in process.


Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMEN T and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions.


Remember to submit your response, including attachments, early to allow time to correct errors. The submission deadline is a hard close. The system will reject responses with errors and will NOT allow late submissions.



Contact Information
Name
Kevin Sullivan
Address
1300 S. 2nd Street
Minneapolis, MN 55454
Phone
Fax
Email
sull0198@umn.edu





Bid Attachments














File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



8 items in 1 pages

RFP - Gortner Lab Loading Dock.docx
Request for Proposal 318 KB

RFx Instructions and Requirements - V9.pdf
RFx Instructions, Requirements, and Rights Reserved by the University 216 KB

pwr.zip
Current Prevailing Wage Rates 479 KB

schedule-of-values-cost-sheet.xlsx
Schedule of Values Cost Sheet 222 KB

Plans and Specs.zip
Plans and Specifications 9.81 MB

Addendum1.zip
Addendum # 1: Pre-Proposal Meeting Documents 4.96 MB

Addendum2.zip
Addendum # 2 Documents 1.54 MB

Addendum3.zip
Addendum # 3: Photos of inside the steam tunnel 9.46 MB



Bid Questions








Question
Sheet S1.1 shows Add Alternate #1 as being additional tunnel reinforcement work north of the base bid scope of work.

This alternate and the work scope involved in this alternate is NOT shown on sheets C1.0, C2.0, C3.0, C4.0, and C6.0. Can these sheets be revised in the addendum to show the work involved in Alternate #1 such as site removals, grading, paving & hardscape, erosion control, affected utilities, and seeding or restoration?
Answer Refer to the attached drawings included with Addendum # 2.
Submitted 10/25/2023 01:15:16 PM (CT)


Question
Sheet S1.1 calls for 148'-9" of "Tunnel Reinforcement Extension" and indicates that this is to be included in "Add Alternate #1".

Attachment E only includes a Base Bid and does not include an Add Alternate #1. Will Attachment E be re-issued in the addendum to include Alternate #1?
Answer Attachment E has been updated and included with Addendum # 2.
Submitted 10/25/2023 01:11:30 PM (CT)







TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >