Minnesota Bids > Bid Detail

Thompson Center Foam Suppressions Replacement Addendum 2

Agency: University of Minnesota
Level of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Opps ID: NBD16744648215335630
Posted Date: Feb 19, 2024
Due Date: Feb 28, 2024
Solicitation No: 01-177-24-2703

Bid Information



Type
Construction Services
Status
Issued
Number
01-177-24-2703 Addendum 2 (Thompson Center Foam Suppressions Replacement)
Issue Date & Time
1/31/2024 01:47:35 PM (CT)
Close Date & Time
2/28/2024 02:00:00 PM (CT)
Time Left
8 days 17 hours 42 minutes 57 seconds
Notes
Design-Build Services for replacement of a foam suppression system in the Thompson Center, located on the east bank of the Twin Cities campus . Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements.



Respondents are prohibited from contacting the identified department about this RFP while in process.


Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMEN T and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions.


Remember to submit your response, including attachments, early to allow time to correct errors. The submission deadline is a hard close. The system will reject responses with errors and will NOT allow late submissions.



Contact Information
Name
Kevin Sullivan
Address
1300 S. 2nd Street
Minneapolis, MN 55454
Phone
Fax
Email
sull0198@umn.edu





Bid Attachments















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



9 items in 1 pages

RFP - TCFSR.docx
Request for Proposal 319 KB

RFx Instructions and Requirements - V9.pdf
RFx Instructions, Requirements, and Rights Reserved by the University 216 KB

PWR.zip
Current Prevailing Wage Rates 479 KB

Table D-1 - Project Cost and Staffing Matrix - TCFSR.xlsx
Table D-1: Project Cost Table and Staffing Matrix 26 KB

As-Builts.zip
As -Built Sprinkler Drawings 20.52 MB

TCEM Floor Plan_Single Interlock Fire Protection.pdf
TCEM Floor Plan 85 KB

TCEM Layout - Hazards (1).pdf
TCEM Facility Hazards and Layout 231 KB

2463_001.pdf
Addendum # 1: Pre-Proposal Meeting Sign-in Sheet 98 KB

Addendum2.pdf
Addendum # 2: RFP Clarification 17 KB



Bid Questions







Question
If a company is part of the winning bid in any way, prime contractor or subcontractor, does that prevent them from bidding on the future construction project?
Answer No, it does not preclude them from bidding on future construction projects.
Submitted 2/8/2024 12:43:37 PM (CT)