Minnesota Bids > Bid Detail

West Central Research and Outreach Center REFUEL - Ammonia Production Facility Addendum 1

Agency: University of Minnesota
Level of Government: State & Local
Category:
  • W - Lease or Rental of Equipment
Opps ID: NBD16744787313536424
Posted Date: Sep 7, 2023
Due Date: Sep 25, 2023
Solicitation No: 14-040-23-2329

Bid Information



Type
Construction Services
Status
Issued
Number
14-040-23-2329 Addendum 1 (West Central Research and Outreach Center REFUEL - Ammonia Production Facility)
Issue Date & Time
8/31/2023 12:22:24 PM (CT)
Close Date & Time
9/25/2023 02:00:00 PM (CT)
Time Left
17 days 20 hours 9 minutes 28 seconds
Notes
Design-Build Services for an Ammonia Production Facility for the West Central Research and Outreach Center . Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements.



Respondents are prohibited from contacting the identified department about this RFP while in process.


Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMEN T and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions.


Remember to submit your response, including attachments, early to allow time to correct errors. The submission deadline is a hard close. The system will reject responses with errors and will NOT allow late submissions.



Contact Information
Name
Kevin Sullivan
Address
1300 S. 2nd Street
Minneapolis, MN 55454
Phone
Fax
Email
sull0198@umn.edu





Bid Attachments





















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



20 items in 2 pages

RFP - WCROC REFUEL.docx
Request for Proposal 318 KB

RFx Instructions and Requirements - V9.pdf
RFx Instructions, Requirements, and Rights Reserved by the University 216 KB

pwr.zip
Current Prevailing Wage Rates 479 KB

Table D-1 - Project Cost and Staffing Matrix - WCROC REFUEL.xlsx
Table D-1: Project Cost Table and Staffing Matrix 26 KB

1. RTI,UMinn 2xC30 to reduce costs.pdf
Quote from NEL for the electrolyzer 450 KB

2. WCROC Site Design WIre DIagram.docx
Site Design Wire Diagram 37 KB

3. E103-Layout-2.pdf
E103_layout-2 782 KB

4. M100-site layout.pdf
M100-site layout 632 KB

5. M201 REV0 water line.pdf
M201 REV0 water line 182 KB

6. As-Builts.zip
As-Builts 20.20 MB

7. R42420_Design_Basis_Ammonia_Pilot_1MTPD(1).docx
R4240_Design_Basis_Ammonia_Pilot_1MTP 1.95 MB

8. Ammonia Absorption System Overview.pdf
Ammonia Absorption System Overview 549 KB

9. Ammonia Absorption System BFD and P&ID.pdf
Ammonia Absorption System BFD and P&ID 248 KB

10. 072910 11132 As Built Drawings.pdf
072910 11132 As Built Drawings 2.98 MB

11. Ammonia Building As Built Prints.pdf
Ammonia Building As Built Prints 3.58 MB



TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >